A feasibility study of
close-range photogrammetry
for
the survey of building
facades along canals in Venice, Italy
by
Lawrence G. Desmond, Ph.D.
Research Associate
California Academy of Sciences
San Francisco, California
USA
A report in fulfillment of
UNESCO Fee Contract:
BOC ref: SC 216.107.4,
Project 929ITA42,
Venice Inner Canals
Presented to:
Professor Angelo Marzollo
Project Officer
UNESCO Regional Office for
Science and Technology in Europe,
Venice, Italy
and
Ing. Fabio Carrera
Consultant
UNESCO Venice Inner Canals Project,
Venice, Italy
December 26, 1994
Oh Venice! Venice! when thy marble walls
Are level with the waters, there shall
be
A cry of nations o'er thy sunken halls,
A loud lament along the sweeping sea!
Ode on Venice, Lord Byron, 1816.
I. Introduction
This study was
initiated to assess the application of photogrammetry to monitor and record
canal walls, and building facades along the canals in Venice.
In 1989, Ing.
Fabio Carrera, consultant for the UNESCO Venice Inner Canals Project, asked
archaeologist Dr. Lawrence Desmond for information concerning his use of
photogrammetry to record important Maya architecture in Mexico. The
World Heritage Site of Chichen Itza, with its ancient Maya buildings and
pyramids, is as much at risk as Venice from a combination of human and
natural causes. In Carrera's opinion, the technology used to record
buildings at Chichen Itza might also find application in Venice to help
in the preservation of its monuments and canals.
Carrera had already
carried out a number of projects to assess the impact of natural and human
effects on the outdoor art and architecture of Venice through the Worcester
Polytechnic Institute Venice Projects Center. UNESCO, in support
of its mission to foster education, science, and culture had taken a special
interest in Venice through a number of preservation projects, including
Carrera's Inner Canals Project, and had designated Venice as a World Heritage
Site.
In the summer of 1991, at the invitation
of Carrera and with funding from the University of Minnesota, Desmond came
to Venice to investigate the potential uses of photogrammetry in the Venice
environment. It soon became clear that a broad study would be needed,
and that UNESCO might be a possible source of funding because of
its previous support of photogrammetry and other scientific methods for
historic preservation.
Funding from
UNESCO was received, and field work, meetings and research were carried
out in Venice from August 27 through September 20, 1994. From September
21 to 27, consultations were held in York, England concerning the Venice
field data, technical problems, and photogrammetric building survey strategy
with Mr. Ross W. A. Dallas, Bsc, FRICS, a leading specialist in measured
buildings surveys and architectural photogrammetry.
II. Background: Photogrammetry and its history, technical developments, users, and systems.
Photogrammetry is defined as the ability to take measurements from photographs, and close-range photogrammetry pertains to non-topographic subjects such as architecture and archaeological sites, and other objects on the order of life size sculpture or smaller.
A. Historical overview
1. Pre-1945
Close-range photogrammetry,
as a method for recording and monitoring architecture, had its origins
in the work of Albrecht Meydenbauer, a German architect, who used the "graphical
intersection" method beginning in 1867. A true pioneer in the use
of photogrammetry, he is credited with the first photogrammetric recording
of Islamic architecture in the Middle East in the 1870s. He established
a school for photogrammetry in Berlin in 1885 which he called the "Messbildanstalt"
or the metric photography establishment. His photographs and survey
data of German architecture, archived safely until after the second world
war, found invaluable use in post-war restoration projects.
His method, "graphical intersection," was very labor intensive and, thus,
found little application outside of the Messbildanstalt.
Photogrammetry's use
of stereo photographs developed early in the 20th century, but was still
little used for architectural surveys before World War II in-spite-of the
extensive field and drafting time required to make drawings from hand measurements,
and that method's potential for measurement errors.
2. After 1945
After the war,
in 1945, conservators began to insist on precise and accurate recording
of buildings prior to their conservation and restoration, and so looked
to stereo-photogrammetry as a solution. Since the 1950s important
historic buildings have been recorded increasingly using photogrammetry,
and in the words of Hans Foramitti founder of the Austrian Bundesdenkmalamt,
"in a perfectly objective and complete manner, including all the irregularities,
whether wanted or not, important or not, of aesthetic, technical, or historic
interest." His statement reflects very closely the philosophy of
Article 9 of the 1964 Charter of Venice resolution on historic preservation,
and was the basis for the formal adoption of photogrammetry by the International
Council on Monuments and Sites (ICOMOS) for historic preservation in 1987.
The International Charter
for the Conservation and Restoration of Monuments and Sites of 1964 (Charter
of Venice), Article 9, also led to the establishment of the International
Committee for Architectural Photogrammetry (CIPA), which was established
in 1970 as a sub-committee of ICOMOS and the International Society for
Photogrammetry and Remote Sensing (ISPRS).
Since 1970, CIPA has
worked with a number of ICOMOS preservation programs at World Heritage
Sites recording important monuments. In 1980, the architectural photogrammetry
practices of CIPA were reviewed at a three day meeting held in Paris.
The papers given at that meeting were published by UNESCO in six languages
under the title, "Optimum practice in architectural photogrammetry surveys."
In 1987, the
8th General Assembly of ICOMOS finalized photogrammetry as its choice for
architectural recording by adoption of Resolution 2, "that photogrammetric
recording techniques be applied for all World Heritage Sites." It
should be mentioned again that Venice and the Venice Lagoon are listed
in UNESCO's "Le Patrimoine Mondial" as World Heritage Site #140, and that
UNESCO has been a serious financial supporter of the use of photogrammetric
recording at World Heritage Sites.
Photogrammetry scholar
Maurice Carbonnell points out in his chapter "Architectural Photogrammetry,"
in the book Non-Topographic Photogrammetry, that: UNESCO, which recommended
the use of photogrammetry, took charge of actions relating to education
in this field, contributed to the establishment of laboratories to undertake
surveys, and made the decision to require photogrammetric surveys as a
prerequisite for all large international operations for safeguarding monuments
or sites.
B. Technical developments and users
UNESCO's adoption of
architectural photogrammetry came at an important turning point in photogrammetry's
development. From the 1980s a revolution in architectural photogrammetry
has taken place with analog stereoplotters (optical mechanical drawing
equipment), once considered as state-of-the-art, now replaced by analytical
stereoplotters. The new analytical plotters are computer controlled
with software designed to speed up and simplify the production of drawings
without loss of accuracy. The new software also makes field operations
simpler by correcting the perspective of a drawing when different camera
angles are required, by reducing the amount of field survey data needed
to measure a photograph in three dimensions, and allowing the use of non-metric
cameras for photography. Other innovative photogrammetric systems
employing advanced software and desk top personal computers have been developed
to utilize non-stereo photographs. These systems replace the stereoplotter
with a digitizing board and hand controlled cursor to make drawings.
The latest addition
to the field of photogrammetry is called "softcopy" where drawings are
made from digitized photographs while being viewed in stereo on a video
monitor. It is expected that within a few years data capture by a
digital camera for direct input into the softcopy system will become economically
feasible.
The field of architectural
photogrammetry is continuing to change with the development of new software
and computer technology, and we are witnessing only the beginning of important
advances that will give greater access to an increasing number of users
and provide new and improved products.
Let us now examine
more closely the purposes of photo-grammetric documentation and identify
its users. Ross Dallas, in his recently issued Factsheet titled,
"The role of modern measured survey in the repair, recording and presentation
of historic buildings," provides a broad overview.
To meet "works" requirements. Whether for major repair or ongoing maintenance, survey drawings are required. They will be used by the Architect to mark up and specify pairs and alterations, by the Engineer to calculate strengths and loadings, by the Quantity Surveyor to estimate costs, by the Contractor to plan out the work, and not least by the Administrator and Committee Member to chart progress and find out where we are!
To help understand the history of the building. Modern conservation recognizes that the specialist should not proceed blindly to repair and conserve, without a clear understanding of the construction, alteration and history of the building. This assessment work is often described nowadays as analytical recording. For this work carried out by the architectural historian and increasingly the archaeologist, accurate measured survey is fundamental. We also recognize today how valuable it is to present information to the Public on the history of a building, and again survey drawings will underpin this work.
To record for posterity the condition and appearance of the building. The very solidity and age of a building often deceives and conceals just how much change and alteration may have taken place over the centuries. Yet often this work is unrecorded, leaving today's specialist to puzzle out what may have happened even in the quite recent past. Also, it is astonishing how many major buildings have quite inadequate records available of them. We owe it to future generations to make records of all our historically important buildings and keep these records safely. (Dallas:1994 Factsheet)
While there are
different types of measured drawings such as floor plans, sections, and
records of plumbing, electrical systems and airconditioning, we are primarily
concerned in this study with elevations drawings. These drawings
help researchers learn the historical background of a building and, if
monitoring techniques are used, changes to a facade can be detected.
When restoration or conservation of a historic building is to be carried
out, facade elevation drawings are a basic tool used by architects and
contractors alike.
C. Systems
1. Rectified photography
There are a number of
photogrammetry systems available, but before summarizing those systems
we should first consider rectified photography as a simple, and straightforward
method for providing elevations drawings of buildings with flat surfaces.
Some three dimensionality in a building, such as a porch or buttress, is
obvious; but problems arise in recording buildings with rectified photography
when there are subtle curves or bulges not easily identified. In
these cases a rectified photograph cannot be used to make a true scaled
drawing. Should the building be flat then an accurately measured
drawing with great architectural detail can be made.
A view camera with
a 4 x 5 inch negative and a 150mm lens is generally used to make the rectified
photograph. The camera is leveled and its etched ground glass grid
is aligned with a horizontal level rod or leveled targets on the building.
The photo is made measurable by placing a scale on the facade or by measuring
between two predetermined locations (targets or natural features) which
can be seen in the photo. Until the development of CAD programs,
a scaled photo was printed with a standard enlarger and a drawing traced
from the photo. Today a drawing can be made from the photo on a digitizing
board using a CAD program or the photo can be digitized and a drawing made
while viewing it on a video monitor. These new software programs
allow for some corrections to perspective and scale, but a flat facade
is mandatory for accurate rectified photographic drawings. This requirement
is quite different from photogrammetric systems where any architectural
element can be measured in all three dimensions.
2. Stereo-photogrammetry
As was mentioned earlier,
stereo-photogrammetry is not a new development, but with the advent of
desk top, low cost, high powered computing systems, analytical stereoplotters
have made measured drawings available to more users. Where one-of-a-kind
drawings were produced by analog systems, we now can modify and correct
drawings by adding CAD "levels" to any drawing and, if needed, print the
drawing in color from a computer file.
The process of stereo-photogrammetric
documentation is complex, but straight forward. First, selected locations
on a facade are measured using a surveying instrument called a theodolite,
it is then photographed with a metric (calibrated) camera so that each
photo overlaps the other creating a three dimensional image. Documentation
work can cease at this stage with the photographs and survey information
stored to form a permanent archival record. Or, the photographs and
survey data can be used to make accurate and detailed line drawings of
the facade.
Strictly speaking any
camera can be used for stereo-photogrammetry, but metric cameras designed
for photogrammetry are preferred because of their superior lenses, film
distortion control, and they require fewer targets to be surveyed for dimensional
control. Large format cameras such as the Wild P31, Zeiss UMK 1318,
and Linhof Metrika are used by most government funded photogrammetry organizations
such as English Heritage in the United Kingdom and the General Inventory
of the Monuments in France, and by private photogrammetry companies where
very precise measurements are required for industrial or aerospace applications.
To make a drawing,
an optical-mechanical instrument called a stereoplotter is used.
The operator places photographs of the facade in the instrument and views
them as a three dimensional image. Then an elevation drawing is made
by carefully tracing the detail of the stonework, cracks, doors, arches,
or architecture. The stereoplotter is linked to a personal computer running
a CAD software program which captures the digitized data in a computer
file. From the computer file the drawing can then be printed on paper
or the file can be modified with the addition of layers of field information
from a number of specialists including architects, engineers or archaeologists
and then printed at some future time to include their additional specifications.
Stereoplotters, made
by companies with long experience such as Leica, International Imaging
Systems, Adam and Officine Galileo Digicart, can provide drawings to match
the skill of the best operators.
4. Other systems
Convergent line or point-by-point
photogrammetry systems such as Fotomass, Rolleimetric, Leica's Elkovision,
and PhotoModeler do not use stereo photos, but rather photos of the subject
taken from a variety of angles. While it is not absolutely essential,
it is generally recommended that control targets be surveyed for dimensional
control as is required for stereo-photogrammetry. The photos are
taken with a partial-metric camera, and enlarged and printed. Subject
matter of interest in the print is then measured on a digitizing board
with a cursor by hand, point-by-point, and the software, running on a desk
top computer, then generates a three dimensional drawing. This approach
has never replaced stereo-photogrammetry, but does provide an excellent
supplement where plain and uncomplicated elevations are required.
Softcopy systems have
been developed by many of the same companies that have been involved in
the production of traditional photogrammetric equipment such as Leica,
Intergraph and Zeiss. But, newcomers such as DAT/EM Systems have
entered this expanding field and provide equally as sophisticated equipment.
These systems allow the operator to trace an image in a manner similar
to that of a stereoplotter, but the digitized stereo photos are viewed
on a video monitor in 3-D. Another advantage of digitized images
is that they can be enhanced or processed in a number of ways by software
or linked to create a single seamless image from many photos. Digitized
images taken directly from a camera and entered into a software drawing
program are not in common use to date, but within a few years these images
will replace film, and all the darkroom work that is associated with it.
A new generation of
surveying instruments complements advances in close-range photogrammetry.
For example Leica's Wild DIOR 3002S theodolite is a reflector free distance
measuring instrument. It allows difficult subjects such as facades
on the narrow canals of Venice to be measured where reflecting targets
cannot easily be placed, and even at extreme angles and distances.
The distance, angle and elevation of points on a facade are recorded using
an attached portable field computer, and software programs can provide
the user with real time three dimensional drawings of the object surveyed.
With this new theodolite system the operator uses the laser dot seen on
the facade to draw a simple elevation by tracing architectural elements
while viewing the dot through the theodolite telescope. Because the
distances, angles and elevations read by the theodolite are transformed
into measurements by the instrument in real time and the laser system requires
no survey targets, structures such as churches and mosques with very high
interiors can be surveyed easily, and structures subject to deformation
such a bridges and bell towers, like those found in Venice, can be monitored
for change.
III. Synopsis of field observations and local resources
An important segment
of this study was to attain what archaeologists call "ground truth."
Ground truth in Venice entailed making observations of the canals, streets,
bridges, outdoor art and architecture on foot and by water. Priorities
were set before hand to facilitate the field work and to eliminate those
locations considered of lesser importance.
In 1992, a program
to renovate canals was developed by the City of Venice (Map
1) and then published under the title "la manutenzione urbana della
citt' di Venezia" in 1993. As part of the plan, priorities were set
for a sequence of renovations with the most important areas designated
1st priority. Early on in this study a meeting was arranged by Carrera
with the public works director for the city of Venice and a coordinator
for the canal renovation project, Ing. Giovanni Sandri, to acquaint him
and his staff with our project objectives, determine the work schedule
for canal renovation, and to understand his requirements as a potential
user of photogrammetric recording.
A. Observations
Detailed observations on foot and from a boat were made to assess: 1) the condition of fabric of selected buildings facing canals, 2) the general condition of canal walls above water, 3) locations for surveying instruments and photogrammetric cameras, 4) the width of canals, and 5) the approximate height of buildings along canals in the four 1st priority areas listed below.
1. First priority areas:
1) Insula Santa Maria Zobenigo
2) Insula Santa Maria Formosa
3) Insula San Zaccaria
4) Insula Ghetto-Chiovere
a) Insula of Santa Maria Zobenigo (Map 2)
In addition to field
notes and measurements, non-metric 35mm stereo photos were taken of all
canals of the Insula of Santa Maria Zobenigo (Map 2), and in other first
priority insule of special interest, from crossing locations such as bridges
or other vantage points. The field study focused on the area of Santa
Maria Zobenigo because it is scheduled first for renovation, historically
important and is representative of challenges to photogrammetry found in
other areas of Venice.
The Insula of Santa
Maria Zobenigo has about 1.3 kilometers of canals and includes the following
rii: 1) Menuo o della Verona, 2) delle Ostreghe, 3) della Veste, 4)
S.M. Zobenigo, 5) Corner-Zaguri, 6) rio Malatin, 7) dei Barcaroli, and
8) di S. Moisè.
The condition of the
canal walls and other architectural features to the rear of the Fenice
Theater were of particular interest because of the unusual height of the
theater (approxi-mately five stories), and the five story apartment building
adjoining to the east (Photo 1).
Both put more weight on their foundations and canal walls than other buildings
in Venice which usually average only three to four stories in height.
This area is also architecturally complicated with new buildings, renovated
buildings and very old buildings side-by-side, and at various levels of
conservation. Several canals meet here, there are numerous bridges,
and heavy power boat and gondola traffic.
While this is
not a study of structural defects in buildings, obvious cracks in the fabric
of the apartment building and at the base of its load bearing columns and
buttress, and cracks in the base of the Fenice Theater tower signal a strong
reason to monitor this area when canal renovation takes place (Photos 2,
3, and 4).
Specifically, a number
of large cracks were observed in the bottom three meters of the Fenice
Theater tower, and also in the step at the base of the tower (Photos 5,
6, and 7).
This tower is not free standing, but is built into the theater on the southeast
side and abuts the five story apartment building east of the theater.
Some older cracks have been covered cosmetically, but a small piece of
what appears to be recently sheared building material from the upper corner
of the tower door, right side, may indicate structural change or deterioration
of building material (Photo 8).
Cracks were also observed
at the base of several of the columns which support a portion of the five
story apartment (Photo 9), and in the
very tall buttress adjacent to rio della Veste where rio delle Ostreghe
joins it (Photo 10). Further inspection
revealed a number of other buildings in the area with cracks and fabric
deterioration evidenced by broken or missing bricks near where the walls
of canals and building facades meet (Photos 11,
12, and 13).
These buildings might benefit from monitoring with a surveying instrument
and photogrammetry, and an analytical inspection by structural engineers
and architects before canal renovation is begun.
The south wall of the
Fenice Theater and the apartment building north of the walk way on the
south side of the canal can be recorded photogrammetrically with little
difficulty because of the many good locations for a camera and surveying
instrument (Photos 14 and 15).
Building facades on the south side present a more difficult problem because
the walk way is not wide enough for useful camera angles, but there are
potential locations across the canal on the north side.
The other canals in
this insula present varying degrees of difficulty for documentation.
For example, rio della Verona east of the Verona bridge, does have a walk
way on one side, but most other canals, like rio Santa Maria Zobenigo south
of the Fenice area, have no walk ways (Photo
16). None of the canals have the convenience of a walk way on
both sides so methods and equipment would have to be devised to find or
create convenient camera and survey instrument platforms. In general,
this important area does not present any insurmountable problems for photogrammetric
recording.
The bell tower that
is associated with the church of San Stefano and fronts on rio Malatin,
leans in the direction of the canal (Photos 17
and 18). And, while rio Malatin
is of second priority, it is important that a plan for monitoring of the
tower be developed prior to any work carried out on the canal.
b) Insula of Santa Maria Formosa
Within the Insula of Santa Maria Formosa (Map 3), the Campiello Querini Stampalia area is considered an area of architectural importance because of its unusual setting with four bridges in close proximity (Photo 19). It should receive photogrammetric recording because of high boat traffic which is likely to increase deterioration of the canal walls. The recording of buildings and bridges in this unique area would not be difficult because of the many convenient instrument and camera platforms.
c) Insula of San Zaccaria
Joining rio Santa Maria Formosa from the south is rio del Rimendio or rio de S. Zaninovo, and to the east is rio di San Severo in the historic Insula San Zaccaria area (Map 4). Rio dei Rimendio has a walk way on the west side for the first part south of Campiello Querini Stampalia (Photo 20), but the balance of the canal to rio dell' Osmarin has no walk ways. Rio di San Severo has a walk way on the east side for most of its length providing an instrument platform for recording of west side facades and canal walls.
d) Insula of Ghetto-Chiovere
The Insula of Ghetto-Chiovere (Map 5) is internationally important because the Ghetto has a deep history as a center of Jewish culture. This area presents no difficulties for photogrammetric recording beyond those noted in other insule.
2. Other areas
While not first priority areas, the
following locations were also considered important and were inspected.
1) Rio dei Greci
2) Canale di Cannaregio
3) Canale dell' Arsenale
4) Rio della Pietà
5) Rio di Santa Caterina (west from
the Gesuiti bridge)
6) Rio di Sant' Andrea (west from
the Sartori bridge)
7) Murano. Building the east side
of rio dei Vetrai about 100 meters from the south entrance.
a) Rio dei Greci
The bell tower of the Greek Church adjacent rio dei Greci (Map 6) is out of plumb in a westerly direction (Photo 21), and the small structure attached to the base of the bell tower in the church yard leans in another direction which may indicate an unstable sub-surface. The upper edge of the canal wall next to the tower appears to be lower than to the north which may indicate subsidence of the area (Photo 22). If renovation of rio dei Greci is carried out, careful monitoring of the tower should be planned.
b) Canale di Cannaregio
On the south side of Canale di Cannaregio (Map 7), free standing attached buildings numbered 554 and 555 are a good subject for future testing of long distance cross canal photogrammetry recording (Photo 23). The walk way on the north side of the canal is an excellent platform for survey instruments and photography.
c) Canale dell' Arsenale
The Canale dell' Arsenale (Map 8) is a third priority area for renovation, but it does provide excellent platforms for photogrammetric instrumentation. The buildings on the west side of the canal, about 100 meters from the Becino di S. Marco, have visible damage to their walls near the interface of the walls with the canal (Photos 24 and 25). Damage will probably continue due to heavy public transportation (ACTV) and other power boat traffic.
d) Rio della Pietà
The fabric of the residential building on the east side of rio della Pietà (Map 6), about 50 meters from the Grand Canal, appears badly damaged and the canal has been closed at the first bridge to the north to reduce boat traffic. Monitoring of this building with a surveying instrument and photogrammetry should have a high priority when renovation of the canal is carried out.
e) Rio di Santa Caterina and rio di Sant' Andrea
The south sides of canals S. Caterina and S. Andrea (second priority) in the north of the city (Map 9), near the Jesuit church, are convenient subjects for photogrammetric recording with walk ways on the north side of each canal along good portions of their lengths. About 20 meters west of the Sartori bridge, on the south side of rio di S. Andrea, the brick work of a building facing the canal is undergoing repair and the wall is being plastered (Photos 26 and 27). A lack of platforms for survey and photographic equipment present typical difficulties for recording of buildings on the north side of these canals.
f) Murano
The city of Venice is not alone in having damaged canal-side architecture. A survey of Murano (Map 10) quickly revealed one building under repair about 100 meters north of the south entrance, east side, of the rio dei Vetrai (Photo 28). Work is underway to stabilize the structure, and there are probably other buildings of historical importance on Murano that are damaged in more subtle ways.
B. Local resources
1. Photogrammetry laboratory
The photogrammetry laboratory
of the University of Venice, Institute of Architecture has up-to-date photogrammetry
equipment including a Rollei Model 6006 medium format partial metric camera,
surveying instruments, a Calcomp drawing plotter, Officine Galileo Digicart
stereoplotter for 3-D image plotting, and a complete Rolleimetric convergent
line photogrammetry system for making point-by-point generated line drawings
(Photo 29). Support equipment includes
486, 66 Mhz personal computers, 19 inch color monitors, photogrammetry
and computer assisted drafting (CAD) software, and digitizing boards.
Prof. Clemente di Thiene
who is responsible for the laboratory has carried out a number of photogrammetric
studies in Venice, and his recently completed survey of the topography
of San Marco plaza is of great importance to flood control managers who
are concerned about the volume of lagoon water entering the plaza during
high water.
2. Centro Previsioni e Segnalazioni Maree
A meeting with Ing. Paolo Canestrelli, coordinator of the Centro Previsioni e Segnalazioni Maree for the city of Venice, was arranged by Carrera. This important office tracks the tides and climatological factors such as wind strength and direction, storms, and the condition of the Adriatic Sea. These data provide a basis for predictions of water levels in the city and, if needed, warning sirens in various parts of the city are activated from this office when the water level reaches predetermined heights. The warnings are intended to protect the citizens of Venice, but also to allow time for protection of important monuments and works of art. Little can be done to stop the high water levels without gates at the entrances to the sea, but photogrammetric documentation can provide a baseline of survey data on monuments which might be damaged or made unstable by high water.
IV. Conclusions and Recommendations
A. Conclusions
Photogrammetric recording
of buildings and canals was found to be feasible in all areas of Venice
inspected for this study. And, while some canals provide few platforms
for photography and surveying, innovative solutions to those problems can
be developed (Photos 30 and 31).
For example, a telescopic camera lift fitted to a barge would be sufficient
as a platform for photography. The same barge fitted with retractable
legs to reach the shallow canal bottom could act as a stable platform for
a surveying instrument. Building heights are ideal (averaging 12.5
meters), and the narrowness of the canals (8-15 meters) presents no technical
problems for surveying or photography.
While this study has
focused on the areas scheduled for renovation, it should be kept in mind
that photogrammetric recording in, or out of the canal areas requires the
same basic techniques with similar time requirements. Recording from
barges may not necessarily be more time consuming that working in the streets
and plazas of Venice, but the task of recording and producing drawings
of all facades in a renovation area is a large one.
For example, to take
the needed 3,600 photographs for stereo-photogrammetry coverage using a
medium format metric camera (6x6 cm negative), and survey control targets
on all facades of the canals of the Insula of Santa Maria Zobenigo would
require two persons approximately 30 days. A larger, or smaller
format camera would alter the coverage, the number of photos, and the field
time requirements. If 1:20 scale drawings are made of each facade,
four stereoplotter operators would take about one year to complete drawings
for all of the Insula of Santa Maria Zobenigo.
As was mentioned previously,
photogrammetric projects have been carried out in Venice by a number of
specialists and researchers including Prof. Clemente di Thiene of the University
of Venice's Institute of Architecture.
The question is not
whether photogrammetry can be used to document architecture in Venice,
that has been answered in the affirmative, but which photogrammetric system
or systems best fit the needs of the users? The question is a complex
one for both users and specialists to resolve, and is especially important
because the system adopted must face the test of time where future technology
may find additional uses for data gathered today. An example of this
type of advance, albeit tangential, is English Heritage's use of stereo-photogrammetric
data from Stonehenge for a virtual reality exhibit in their new visitor
center. Clearly, users must be part of the process of photogrammetric
documentation, and resources need to be made available so that they can
determine which system best fits their needs.
In another example,
the public works department of Venice under the direction of Ing. Sandri
has expressed a great deal of interest in photogrammetric recording because
the department, for legal and preservation reasons, needs an accurate record
of buildings along canals prior to renovation. The condition of each
facade would be recorded before and after work, and should structural or
fabric problems develop in association with the canal renovation program
very precise photogrammetric data would be available to assess the original
condition of the building and measure the extent of new damage. Presumably,
the photogrammetric survey carried out on behalf of the public works department
would also have to stand up in a court of law. And, while the city
of Venice public works and legal departments have some understanding of
the products and methods of photogrammetry, it may not be thorough enough
at this time for them to make an educated decision as to which system best
meets their needs. A good understanding of the systems is especially
important if legal issues are involved.
Other potential users
of photogrammetry in Venice should be mentioned such as architects, conservators,
contractors, engineers, university researchers, art historians, urban planners
and archaeologists--to name the obvious. Thus, users with projects
to be carried out in any of the Venice environments must understand what
the different systems offer, and then decide which system best satisfies
their requirements from both a technical and financial standpoint.
Not only are the requirements
of special interest users important, but international preservation organizations
with very broad objectives such as the U.S. National Park Service's National
Center for Preservation Technology and Training (NCPTT), the Getty Conservation
Institute, UNESCO, and ICOMOS must understand and be guided by knowledge
of different photogrammetric systems, their costs, and how they are applied
in Venice.
The Committee for Architectural
Photogrammetry, in its 1981 report Optimum practice in architectural photogrammetry
surveys, made the following statement on the importance of user requirements
in determining how a particular building survey should be carried out.
In the work of determining
the optimum conditions for the making of architectural photogrammetry surveys,
overwhelming importance attaches to the way such surveys are envisaged,
programmed and organized...a survey must provide knowledge of the effective
form of the building at a given moment and measurement of that form, so
that its current state may be diagnosed and its architecture may be analyzed.
However, this common basic conception may and does lead in practice to
widely differing applications according to the purpose of the
survey; according, that is, to the requirements
of its user, which will determine its intended degree of accuracy, its
scale, its degree of completeness and its manner of expression.
B. Recommendations
1. Monitoring of selected structures
As Ing. Sandri pointed
out, the draining of canals, as part of the renovation process, may pose
a threat to the
structural integrity of some buildings
situated next to canals. Field examination in this study indicated
that the following structures should be closely monitored to detect change
when adjacent canals are renovated: the Fenice Theater, its tower, and
the five story apartment building to the east, the bell tower of the Greek
Church adjacent rio dei Greci, the bell tower of the church of San Stefano
that fronts on rio Malatin, and the residential building on the east side
of rio della PietB (about 50 meters from the Grand Canal).
Structures should be
recorded and monitored using stereo-photogrammetry, and a total station
surveying instrument so that the condition of the fabric of the buildings
can be documented to provide the graphical and mathematical data needed
for analysis by structural engineers, conservators, and the public works
department of Venice.
The area of the Fenice
Theater and apartment building, the bell towers of San Stefano and the
Greek Church can all be recorded or monitored with little difficulty because
of convenient locations for instruments. The residential building
on the east side of rio della PietB does not have easy access for instruments,
but that may be solved by working from the bridge area to the north, or
within, or on the roofs of adjacent buildings. Because recording
is limited, and in areas where camera and theodolite platforms are available,
there would be no need to design and construct a special platform for use
in the canals.
To carry out monitoring,
permanent surveying markers must be placed in the walk ways or other secure
locations. This requires no more than driving a thin steel bar into
the walk way so that the surveying instrument can be returned to that same
exact location. In addition, survey targets are placed on the buildings
and remain there during the monitoring project, but targets can be eliminated,
in some cases, by using a laser surveying instrument which measures the
location of architectural features.
The survey of a building
also provides the three dimensional coordinates needed by stereo-photogrammetry
to measure photos for making architectural drawings. Camera locations
need only be approximate each time a building is recorded. Thus,
once a building is surveyed, to record it with a calibrated camera takes
little added time, and provides an enormous amount of additional visual
and analytical documentation.
The use of stereo-photogrammetry
under these circumstances is based on the assumption that this system,
considered a standard of the industry, can conform to the most stringent
of user requirements. Stereo-photogrammetry is the system used by
English Heritage and The General Inventory of Monuments of France, and
is used for most industrial applications such as aerospace where extremes
of precision are the order of the day. Other systems can provide
excellent results and do have an important place in architectural recording,
but stereo-photogrammetry, a system well tested over time, offers the user
an approach that can meet all reasonable standards and can produce drawings
from intricate to simple tracings.
In addition to technical
considerations, it should be noted that the budgetary constraints of users
such as the public works department of Venice, the City of Venice legal
department or the Venice Inner Canals Project must be taken into account.
The recording of an individual facade, typical of those along canals, including
field work and the making of an architectural drawing at a 1:20 scale could
cost as much as $8,000 if done by an international photogrammetry team.
But, costs can be reduced by employing local surveyors and photographers
familiar with photogrammetric methodology, and by producing a drawing of
part of a facade. A local resource, the photogrammetric laboratory
of the University of Venice's Institute of Architecture, indicated it would
be willing to discuss further the possibility of collaboration in a recording
and monitoring project.
An additional advantage
of local collaboration is that a group such as the Institute of Architecture's
photogrammetry laboratory, and the Venice Inner Canals Project can work
closely with the City of Venice to provide systems information and incorporate
the requirements of the city into this project which is limited to a few
structures. It would not be advisable to initiate a complete survey
of canal renovation areas until the department of public works has added
understanding of available photogrammetric systems.
This leads us again
to the important point that a system should fit the user, and a user must
understand the capabilities of different photogrammetry systems to be able
to make a proper selection. But, it is not only the system
that needs to be understood in this complex selection process, it is the
parameters within a system that need also to be known. To paraphrase
Carbonnell, we need input from the user to determine accuracy, scale, completeness
of a drawing and the manner of its expression. How, then, can Venice
users, such as the public works department, come to a better understanding
of systems and their capabilities?
2. Photogrammetric pilot studies and platform design
The Inner Canals Project
has carried out scientific projects in Venice over a number of years, and
is in a position administer close-range photogrammetry pilot studies made
in the Venice environment. Technical reports, articles and standards
on photogrammetry are important, but relatively useless to non-specialists.
The pilot studies recommended here would be designed provide an in-depth
examination of systems for utilization by non-specialist users of photogrammetry.
Four photogrammetric
systems, and a Leica Wild DIOR 3002S (or equivalent) total station theodolite
with real time drawing capability should be examined in the pilot studies.
One facade should be selected for study in the Insula of Santa Maria Zobenigo
near the Fenice Theater where walk ways provide adequate room for instruments.
The following systems would be tested: 1) stereo-photogrammetry, 2) rectified
photography, 3) convergent line (point-by-point) photogrammetry, 4) softcopy
photogrammetry, and 5) Leica Wild DIOR 3002S.
A report, in non-technical
language, of each study would be published to include, 1) a description
of the methodology used, including parameters of accuracy, types of final
product expression, and potential level of detail, 2) description of field
work, 3) times required to carry out individual activities, 4) equipment
required in the field and laboratory, and 5) an elevation drawing at a
scale of 1:20, and a scaled drawing generated by the total station theodolite
based on the distance to the facade to be determined at the time of field
work.
It is important that
persons be selected for pilot studies who are known for their expertise
in one of the systems suggested for testing. For more general project
guidance, this author, Mr. Ross Dallas, Prof. Clemente di Thiene or Dr.
Harrison Eiteljorg II, director of the Center for the Study of Architecture
at Bryn Mawr College, represent the type of scholar with broad knowledge
needed as a technical consultant to develop and review project standards,
reports and drawings. Administrative requirements such as overall
project management, budgetary control, publishing, editing and interface
with UNESCO would be carried out through the Venice Inner Canals Project.
Once the pilot study
project is completed, the Venice Inner Canals Project would act as an on-going
educational and information focus for activities concerned with close-range
photogrammetry. Seminars, workshops, conferences or individual consultations
could be offered to disseminate information on photogrammetric systems
developed through the pilot studies.
In addition, a project
to design a camera and survey instrument platform for use in the canals
of Venice should be included in the pilot studies program. Funding
should be allocated for design only, with purchase of equipment and construction
deferred to when a full monitoring and documentation project is funded.
A detailed proposal
for the pilot studies and platform design project should be submitted to
UNESCO through the Venice Inner Canals Project. An estimated $70,900
would be needed for technical consulting, the pilot studies, design a platform,
administer the project, and provide for preparation of publication of the
results. Appendix A gives a brief description of personnel and their
duties, and a budget of salaries and expenses for the project.
3. A Venice colloquium on photogrammetry
Upon completion of the
pilot studies and platform design project, and publication of its conclusions,
a colloquium, approximately three days in length, should be organized to
address issues concerning the application of close-range photogrammetry
in Venice.
Such a colloquium would
provide a forum for a deeper understanding of applications of close-range
photogrammetry through closely focused scholarly responses to the findings
of the Venice Inner Canals Project pilot studies. The colloquium
would bring together in Venice, under one roof, photogrammetry specialists
and users from a variety of disciplines to focus on the use of photogrammetry
as part of the preservation process.
The specific purposes
of the colloquium would be to, 1) develop a broad understanding of photogrammetric
systems for use in Venice, 2) generate cross-disciplinary scholarly feedback
on the systems tested, 3) develop a strategy for a long term photo-grammetric
recording program in Venice, and 4) develop a strategy for long term funding.
The invitees would
include members of the International Committee for Architectural Photogrammetry
(CIPA), surveyors with practical and theoretical knowledge of advanced
surveying systems, specialists in the measured survey of historic buildings,
building conservators including engineers, academics working on conservation
projects in Venice such as art historians, biologists, chemists and engineers,
architects, contractors, archivists, and representatives of international
funding and conservation organizations. Prior to the colloquium the
written reports of the pilot studies would be sent to each participant.
A selected number of
participants would be asked to prepare papers in response to the pilot
study reports, and an open discussion would be scheduled after each formal
response. Discussions would be recorded and later transcribed for
publication along with written papers. Other colloquium papers, not
in direct response to the pilot studies, would focus on broader concerns
such as future uses of Venice photogrammetric studies, archival systems
for storage and retrieval of photogrammetric data, issues related to archival
access, and the role of international organizations like UNESCO, ICOMOS,
NCPTT and the Getty Conservation Institute in the preservation of Venice.
The proceedings of
the colloquium would be published in a volume that would include papers
and round table discussions, and the resolutions of the colloquium.
The colloquium should
be limited to approximately forty participants in the following categories:
CIPA:..............................................................
4
Pilot study specialists...................................
7
UNESCO....................................................
...5
ICOMOS........................................................
3
International Conservation organizations....5
Users............................................................16
An estimated $97,425
would be needed for organization of the colloquium which would include
part-time staff, participants' transportation, food and lodging, colloquium
facilities and equipment, and the editing of papers and responses for publication.
Some administrative activities might be carried out through a local organization
such as the Venice Inner Canals Project to facilitate organization and
reduce logistical costs.
Appendix B provides
a list of organizing personnel and brief descriptions of their duties,
a budget of salaries and expenses for organizing personnel, and estimated
expenses for the three days of the colloquium.
To develop a detailed
proposal for the colloquium and its funding, an ad hoc committee, drawn
from the specialties and organizations noted above, would be formed to
provide expert assistance and institutional support. If UNESCO has
a development officer on staff that person could work with the committee,
or UNESCO could provide a small grant to a development consultant to collaborate
with the committee to develop a proposal for the colloquium.
V. Acknowledgements
Quite a number of persons
and institutions deserve thanks for their contribution to the success of
this project. They provided an enormous amount help and advice which
substantially aided the completion of this study. In the end, of
course, I must take full responsibility for any errors and omissions, and
the recommendations and conclusions.
First to come to mind
is the support, suggestions and insights of Prof. Angelo Marzollo, UNESCO
project officer in Venice. Without funding from UNESCO this project
could not have been carried out--I extend my most sincere thanks.
To Fabio Carrera, who
has worked intensively on historic preservation projects in Venice for
many years, I would like to extend many thanks for his unceasing help and
vision in the organization, development and carrying out of the project.
And exceptional hospitality was always forthcoming from all the Carreras--Fabio
and Jackie, and Cino who welcomed me at al Cubo. Abundant Venetian
hospitality also was extended by Prof. Gerolamo Fazzini, president of the
Venice section of the Archeoclub d'Italia, who made my stay on Isola del
Lazzaretto Nuovo a splendid experience--with many thanks to his family
and club volunteers who I shall not forget for their many kindnesses--and
marvelous meals. Thanks also to Nick Eiteljorg of the Center for
the Study of Architecture for his many suggestions about the pilot studies
and colloquium.
Great thanks are also
due to Ross Dallas for important technical advice, and taking time from
his very busy building survey schedule at Hampton Court to review and discuss,
in great depth, the Venice study. And, to his family including Pam
and Sarah, most sincere appreciation for making my stay in York a culinary
delight.
Lawrence G. Desmond, Ph.D.
Carnelian Bay, California
USA
VI. References
____________
1966 International charter for the
conservation and restoration of monuments and sites. Pamphlet published
by the International Council of Monuments and Sites.
____________
1981 Optimum practice in architectural
photogrammetry surveys. Paris: UNESCO in six languages. English translation
under the direction of Ross W.A. Dallas, University of York, Institute
of Advanced Architectural Studies.
____________
1993 La manutenzione urbana della
cittB di venezia. Venice/Mestre: Stamperia Cetid s.r.l.
Carbonnell, Maurice
1989 Architectural photogrammetry.
In, H.M. Karara (ed.), Non-Topographic photogrammetry, pp. 321-347.
Falls Church: American Society for Photogrammetry and Remote Sensing.
Carrera, Fabio
1993 Computerized catalog of outdoor
art in Venice with automatic estimation of restoration costs. In,
M.-J. Thiel (ed.), Proceedings of the International RILEM/UNESCO Congress:
Conservation of Stone and other Materials: Research-Industry-Media, Volume
Two, "Prevention and Treatments," pp. 102-109. London: E & FN
Spon.
Dallas, Ross W.A.
1988 A specification for photogrammetry
survey. Proceedings of the 1988 Congress of the International Society
for Photogrammetry and Remote Sensing, Kyoto, Japan.
1993 Photogrammetric techniques
for measured surveys of buildings. Reading: The College of Estate
Management.
1994 The role of modern measured
survey in the repair, recording and presentation of historic buildings.
In Factsheet, unpublished.
Desmond, Lawrence G.
1994 The use of close-range photogrammetry
for archaeological documentation: Chichen Itza and Uxmal, 1989. In,
Virginia Fields (ed.), Proceedings of the 7th Palenque Conference, Vol.
IX, pp. 43-48. San Francisco: Precolumbian Art Research Institute.
Foramitti, Hans
1973 La photogrammetrie au service
des conservateurs. Rome: ICCROM.
Karara, H.M. (ed.)
1989 Non-Topographic Photogrammetry.
2nd Edition. Falls Church: American Society for Photogrammetry and Remote
Sensing.
Maretto, Paolo
1992 La casa veneziana nella storia
della cittB dalle origini all'ottocento. 4th Edition. Venice: Marsilio
Editori.
Meyer, R.
1985 Albrecht Meydenbauer, baukunst
in historischen Fotografien. Leipzig: V.E.B. Fotokinoverlag.
Salzano, Edoardo (ed.)
1991 Atlante di Venezia. 4th
Edition. Venice: Marsilio Editori.